翻訳と辞書
Words near each other
・ Plogastel-Saint-Germain
・ Ploggensee
・ Plogger
・ Plogoff
・ Plogonnec
・ Plogskaftet Nunataks
・ Plogue Art et Technologie, Inc.
・ Ploiaria
・ Ploiaria metapterina
・ Ploiariolini
・ Ploidy
・ Ploiești
・ Ploiești metropolitan area
・ Ploiești National Coal Company
・ Ploiești Philharmonic Orchestra
Ploiești–Bacău Motorway
・ Ploima
・ Ploioderma
・ Ploisy
・ Plok
・ PLOKTA
・ Plokta
・ Plokštinė missile base
・ Plomari
・ Plomb
・ Plombage
・ Plombières
・ Plombières (disambiguation)
・ Plombières Agreement
・ Plombières-les-Bains


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ploiești–Bacău Motorway : ウィキペディア英語版
Ploiești–Bacău Motorway

The Ploiești–Bacău Motorway is a planned motorway in Romania, designed to link Ploiești with the north-eastern part of the country, partly along the Pan-European Corridor IX. Initially it was designed as a 314 km long motorway branching off the A3 motorway and passing through Buzău, Focșani, and Albița, on the border with Republic of Moldova. However, since 2014 plans in favor of a motorway past Focșani were scrapped in favor of a motorway towards Bacău and Suceava termed A7.〔http://adevarul.ro/locale/arad/pe-lotul-autostrada-pecica--nadlac-putea-circula-cateva-zile-1_5486c1d3448e03c0fd985a10/index.html〕
The first section, from Ploiești to Focșani (133 km),〔(【引用サイトリンク】url=http://www.cnadnr.ro/proiect.php?id=262 )〕 was proposed for a concession contract for tendering first half of 2013.〔(【引用サイトリンク】url=http://www.ziarulprahova.ro/stiri/administratia-locala/128515/cnadnr-si-a-anuntat-intentia-de-construire-prin-concesiune-a-autostrazii-ploiesti-buzau-focsani )〕 No contract was signed, and the only section that has been tendered was the Bacău bypass (30.6 km, of which 19.7 km of motorway) in August 2013, but built at only half profile.〔 It was awarded for construction in November 2013, but the results of the tender were contested by some of the participants.〔http://www.ziaruldebacau.ro/licitatia-pentru-soseaua-de-centura-a-bacaului-a-fost-contestata/〕 Later in 2014, the whole motorway was redesigned as an expressway that would later be expanded to full motorway specifications.
The motorway from Focșani to Albița (155 km)〔(【引用サイトリンク】url=http://www.cnadnr.ro/proiect.php?id=263 )〕 will have a different route number assigned, and April 2014, the section between Focșani and Albița is no longer a priority in the current master plan for the national motorway network.〔http://economie.hotnews.ro/stiri-eurofonduri-16995937-fotogalerie-primele-imagini-masterplanul-pentru-transporturi-autostrazi-vrea-faca-guvernul-ponta-pana-2022.htm〕
==Gallery==

File:Romania Bacau Bypass Motorway.svg|Map of the Bacău bypass


抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ploiești–Bacău Motorway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.